Blue Oak Energy was the design-build firm for a 173kW rooftop system at the Shops at Mission Viejo, a major retail center in Orange County. Blue Oak Energy concentrated its efforts and was able to procure a permit in one week and finish construction and commissioning within a month. With limited space and options for locating electrical equipment, carefully planned solutions were required for inverter placement and AC conduit routing. The result was a string-monitored system delivered in time for the holidays.